Fleet Pitot-Static & Transponder Certification

On-site testing completed across a multi-aircraft fleet without moving any airframe.

Technician connecting calibrated pitot-static test equipment to a business jet

The Work

What was involved.

Rather than cycling each aircraft through a shop, testing was carried out on site across the fleet on a coordinated schedule. Pitot-static and transponder testing was completed against calibrated references, discrepancies investigated as they were found, and results documented for each aircraft's records.

Result

On-site testing completed across a multi-aircraft fleet without moving any airframe.

Capability

Testing & Certification

Pitot-static and transponder testing, system verification and inspection.

Process

How this kind of work runs

Every job follows the same four steps, so you always know which stage yours is at.

  1. 01

    Scope & scheduling

    Confirm which tests are required, on which aircraft, and where the work will happen.

  2. 02

    Setup & connection

    Test equipment connected to the aircraft under the correct procedure and precautions.

  3. 03

    Test & measure

    Testing carried out across the required range, with any discrepancy investigated.

  4. 04

    Document & release

    Results recorded, discrepancies reported, and paperwork completed for the aircraft records.