Skip to content

Aircraft Installations & Upgrades

Aircraft System Installation

New system installed, integrated and inspected with full functional verification.

Technician inspecting avionics components through an open aircraft access panel

The Work

What was involved.

New equipment was installed and integrated with the aircraft's existing systems, with harnesses built and routed to suit. Functional and system-level testing was completed and documented, followed by final inspection before the aircraft was returned to the operator.

Result

New system installed, integrated and inspected with full functional verification.

Capability

Aircraft Installations & Upgrades

Single equipment changes through complete glass-cockpit conversions.

Process

How this kind of work runs

Every job follows the same four steps, so you always know which stage yours is at.

  1. 01

    Survey & proposal

    Review the current panel and systems, agree the target configuration, and quote the real scope.

  2. 02

    Planning & parts

    Equipment sourced, harnesses and interfaces planned, and downtime scheduled around your operation.

  3. 03

    Installation & integration

    Removal, installation, wiring, and integration with the systems that remain on the aircraft.

  4. 04

    Test & inspection

    System verification, functional checks and final inspection with documentation.

Next Step

Similar problem?
Or a stranger one?

Most of the work worth talking about started as something another shop had already looked at.